Project Overview
The project involved a comprehensive hard landscaping scheme designed to enhance the campus environment with durable, aesthetically pleasing surfaces and bespoke street furniture. Zack Contractors were responsible for all aspects of the hard landscaping, delivering a variety of finishes and materials tailored to the clients vision.
Client:
Location:
Duration:
Neilcott Construction on behalf of Kingston University
Kingston University Campus
24 weeks
Services Provided
-
Concrete and natural stone paving
-
Granite Kerb installation
-
Resin Bound Gravel surfacing
-
Finished in-situ coloured concrete footpaths with Chromofibre reinforcement
-
Installation of bespoke concrete benches
-
Installation of bespoke hardwood timber benches
Project Challenges
-
Matching the materials palette to the previous phase of landscaping to ensure seamless visual continuity across the campus
-
Restricted access to the courtyard site, requiring careful logistics and material handling to minimise disruption
-
Strict noise restrictions to comply with university regulations and maintain a conducive learning environment
-
Meeting stringent BREEAM sustainability requirements, including the use of recycled materials
-
Managing a variety of materials and finishes to meet design specifications
-
Working within an active university environment with minimal disruption
-
Installing bespoke furniture to exacting quality and durability standards
Gallery
Our Approach
01
Materials Matching & Quality Control
We conducted detailed assessments of the existing materials used in the previous landscaping phase to source and install concrete, natural stone, resin bound gravel, and coloured concrete that matched precisely, ensuring a cohesive campus aesthetic. All concrete footpaths and bespoke concrete features incorporated Chromofibre reinforcement to enhance durability and crack resistance.
02
Access & Logistics Planning
Due to restricted access in the courtyard area, we developed a tailored logistics plan to efficiently deliver and handle materials, minimise site storage needs, and maintain safe, clear working zones.
03
Noise Management
To comply with strict noise regulations, we scheduled the noisiest activities during designated times, employed low-noise equipment where possible, and maintained close communication with university management to reduce disruption. Importantly, the university remained fully open throughout the works, with all measures carefully planned to ensure a safe and quiet environment for students and staff.
04
Concrete & Natural Stone Paving
High-quality concrete and natural stone paving were laid with precision, blending seamlessly with the existing campus hard landscaping. In-situ coloured concrete footpaths included Chromofibre reinforcement for superior strength and longevity.
05
Kerb Installation
Granite kerbs were installed to define pathways, protect landscaped areas, and provide structural support for surfacing materials.
06
Resin Bound Gravel & Finished In-Situ Coloured Concrete
Resin bound gravel was applied to create attractive, permeable surfaces that complemented the hard landscaping and improved drainage. Finished in-situ coloured concrete footpaths, reinforced with Chromofibre, were poured and finished on-site in colours matching the university’s existing palette.
07
Bespoke Concrete Features & Street Furniture
Custom concrete elements and bespoke hardwood timber and steel benches were installed to enhance usability and aesthetics.
Outcomes
-
Seamless integration of new hard landscaping with the previous phase’s materials palette, preserving campus visual theme.
-
Efficient execution despite restricted courtyard access, maintaining safety and minimal disruption.
-
Compliance with noise restrictions ensured uninterrupted university activities.
-
Durable and attractive hard landscaping complemented by bespoke street furniture, enhancing the campus environment.
-
Use of Chromofibre reinforcement significantly improved the durability and lifespan of concrete elements.
-
Project completed on schedule and within client expectations.