Case Studies - Holloway Road
Holloway Road
Project Overview
The Holloway Road Improvement Project formed part of the STIC (Surface Treatment and Infrastructure Contract) framework, commissioned by Transport for London (TfL) and delivered by Eurovia. The project involved critical highways and streetscape upgrades along one of North London’s busiest corridors. Specialist subcontractor Zack Contractors played a key role in delivering all groundworks, surfacing, drainage, and comprehensive traffic infrastructure works to support this high-profile urban scheme.
Client:
Location:
Duration:
Eurovia on behalf of Transport for London (TfL)
Holloway Road, London
44 weeks
Services Provided
-
Site clearance and preparation
-
Installation of surface water drainage systems
-
Asphalt surfacing
-
Granite kerb installation
-
ASP concrete paving installation
-
Traffic infrastructure works including NAL sockets, inspection chambers and service ducts
-
Traffic signs and road markings
-
Traffic management and safety controls
-
Compliance with TfL and STIC specifications
Project Challenges
-
Maintaining traffic flow and pedestrian safety on a heavily trafficked urban artery
-
Coordinating works within tight timeframes to minimise disruption
-
Strict adherence to TfL’s technical standards and environmental policies
-
Managing utilities and adoptable drainage under STIC contract requirements
-
Complex pedestrian management to ensure safety and maintain accesses utilising
Strongwall barriers -
Installation of traffic infrastructure components to TfL standards to suit phased
commissioning of new road layout
Gallery
Our Approach
01
Comprehensive Traffic Management
Zack Contractors implemented detailed traffic management plans in line with TfL’s safety requirements to safely manage road users and pedestrians during all phases of construction, minimising congestion and risk.
02
Highway Groundworks & Drainage Installation
Groundworks included excavation sub-base preparation, and installation of adoptable drainage systems designed to meet TfL and STIC standards, ensuring effective surface water management and long-term highway durability.
03
Asphalt Surfacing
Using high-quality materials compliant with TfL specifications, Zack Contractors completed asphalt resurfacing and patch repairs, providing a smooth, durable carriageway surface capable of withstanding high traffic volumes.
04
Granite Kerb & Concrete Paving Installation
Granite kerbs were installed to provide durable edge restraints with a high-quality finish suitable for the urban environment. ASP Concrete paving was laid in pedestrian and service areas, enhancing safety and accessibility while complementing the surrounding streetscape.
05
Traffic Infrastructure Works
A key element of the project was the installation of traffic infrastructure to TfL standards, including:
-
NAL Sockets: Installed to securely house traffic signal poles and lighting columns, providing reliable, maintenance-friendly connections.
-
Inspection Chambers: Strategically placed inspection chambers were constructed for ongoing access to ducting systems, allowing efficient maintenance and reducing disruption.
-
Ducting Systems: High-quality ducting networks were laid to facilitate future electrical and communication cabling, ensuring ease of access and protection of utilities under roadways and footpaths.
All components were installed following TfL’s stringent specifications for materials, installation practices, and durability, ensuring long-term reliability and safety of the traffic infrastructure.
06
Traffic Signage and Road Marking
New road signage and thermoplastic line markings were installed in compliance with TfL guidelines to improve traffic flow and pedestrian safety.
07
Coordination & Compliance
Working closely with Eurovia and TfL project managers, all works were monitored to ensure compliance with strict quality, environmental, and safety standards.
Outcomes
-
The Holloway Road corridor was successfully upgraded with improved drainage, resurfacing, and comprehensive traffic infrastructure, enhancing safety and ride quality for all users.
-
Installation of NAL sockets and inspection chambers provided a future-proofed traffic management network, compliant with TfL’s high standards.
-
High-quality granite kerbs and concrete paving contributed to a durable and attractive streetscape.
-
Works were completed on time and within budget despite complex traffic management and programme demands.
-
Effective communication and planning minimised disruption to local businesses, residents, and road users.